04.12.2018
The B and C 2nd product sugar melting mixers have been installed. Automatic system of the sugar end. Reconstruction of the lime gas kiln with automatic control system. Reconstruction of the vacuum condensing units and recirculating water cooling circuits. Automatic system of the vacuum condensing unit. The syrup collector is installed after the sulfitation stage in the condensate system. The rapid and baffle heaters were installed at the evaporating station. Automatic system of the evaporating station and condensate system. Automation of the filtering station.
years experience in the development of production projects
successful projects of different scale in Ukraine and abroad
Representative offices in Bulgaria, Czech Republic