2009 Projects

Erken-Shahar Sugar Mill, Russia

04.12.2018

proj2009 2Reconstruction of the lime kiln with the achievement of warranty obligations for the operation of one furnace with a capacity of 4,500 tons of beet/day (3 furnaces have been installed and operated at the plant). Introduction of the automatic control system of limestone dosing, loading and discharge line, control of carbonation gas feeding to the juice purification station. Introduction of the automatic control system of the juice purification station (process scheme from the Caucasian Scientific Research Institute of Sugar Beet and Sugar (KNIISSiS), Yu. I. Molotilin)